SkyCab

PRT

Light Rail

GRT

Total Benefits

(NZ$000,000)

$2436

$2005

$1212

$1342

Capital Cost

(NZ$000,000)

$617

$682

$1844

$2056

Benefit Cost Ratio

3.94

2.94

0.66

0.65